01 / Rates and dates
One tariff, three start dates
Maersk's 13 November advisory lists OCE exports from Bulgaria, Georgia and Romania to world destinations; OCR imports to Bulgaria and Georgia; and OCR imports to Romania excluding China. Each listed direction costs USD 30 per 20-foot container or USD 60 per 40/45-foot container.
| Trade category | Start date |
|---|---|
| Non-regulated countries | 14 November 2026 |
| Vietnam | 29 November 2026 |
| Regulated countries | 14 December 2026 |
The notice defines regulated countries as Taiwan, United States, Guam, Puerto Rico, American Samoa, U.S. Virgin Islands, Colombia, Brazil and South Korea. The non-regulated and regulated applications continue until further notice.
02 / Booking basis
Direction and pricing date decide the check
For non-SPOT bookings, Maersk uses Price Calculation Date: scheduled departure of the first water leg at booking confirmation for non-FMC trades, and last container gate-in for FMC trades. Payment follows the freight-paid location. Other applicable charges remain separate.
The Romania exception is directional. Do not copy an import exclusion into an export quotation, or treat a country heading as proof that every origin qualifies. Ask the carrier to confirm the actual origin–destination pair and charge code against the booking.
03 / Quote checks
Reconcile the line item before accepting a revised offer
The following are practical implications of the announcement:
- Keep the booking evidence. Save the confirmation version, relevant departure or gate-in date, equipment list and quoted surcharge basis together. This gives the reviewer a reproducible explanation of the charge.
- Separate the freight components. Request an itemised offer showing base freight, this line item and other charges. Ask whether the new amount is already included before adding it to a budget.
- Check container counts. As an arithmetic illustration, two 20-foot units and one 40-foot unit at the listed rates total USD 120 for this surcharge alone. This is not a complete shipment price or confirmation of applicability.
- Resolve the quotation gap. If a quote and booking show different dates or scope, obtain a written reconciliation before approving the revision. Record who pays and where the charge will appear.
For container ocean-freight planning, keep this tariff check alongside the shipment's service, space and delivery requirements. A cost notice does not itself confirm a sailing or capacity.
04 / Source
The carrier announcement
This report attributes the tariff to Maersk. The quote-review steps and mixed-container calculation are our analysis, rather than additional carrier conditions.