Operating controls
Validate the carrier, vehicle and route before dispatch.
The operating plan checks carrier suitability, vehicle documentation, equipment condition, cargo compatibility, site access and route constraints against the confirmed load. Required licences, permits, insurance evidence and subcontracting controls depend on the countries, cargo and service performed.
On routes governed by European Union or AETR rules, driving and rest-time planning, tachograph obligations and driver records are considered where applicable. Loading, load distribution and securing responsibilities are assigned before collection; dangerous goods move only after classification, documentation, equipment, driver and route acceptance are confirmed.
- Carrier, vehicle and driver requirements checked for the lane
- Loading method, weight distribution and cargo securement agreed
- Border, permit, driving-time and route restrictions reviewed
- Temperature, seal, security or dangerous-goods controls added when applicable