01 / Announced change
A different reference date for later-added inland delivery
Maersk's 3 November notice covers import bills of lading booked as CY moves with destination inland delivery subsequently added through an import shipment. From 1 January 2027, newly created import shipments in scope will use their creation date for inland charges, including fuel, instead of the Ocean Booking Price Calculation Date (PCD).
The countries named are Albania, Bosnia and Herzegovina, Croatia, Cyprus, Czech Republic, Greece, Hungary, Italy, Macedonia, Malta, Montenegro, San Marino, Serbia, Slovakia and Slovenia. The notice uses the name Macedonia.
Destination Store Door (SD) bills of lading retain the Ocean Booking PCD. This is an announced future change to the pricing basis; the notice does not provide new tariff amounts.
02 / Practical implications
Compare the transport scope before comparing the price
For importers planning shipments around year-end, the commercial question is when the destination delivery was ordered and under which booking arrangement. A cargo arrival date alone is insufficient to decide which pricing basis the carrier will apply. The following are planning checks derived from the announcement:
- Identify the booked destination move. Check the actual bill of lading and booking confirmation, then ask whether the delivery is included in that arrangement or being ordered separately. A quotation describing a final address may still need clarification about how the inland leg is booked.
- Keep the relevant dates together. Retain the ocean booking reference, the inland order reference and the import shipment creation record. Ask the carrier which record determines the charge basis for the specific movement. Avoid substituting a requested delivery day or an internal purchase-order date.
- Ask for a comparable written quotation. Record the delivery location, equipment, transport scope, currency, fuel treatment and validity alongside the price. If an earlier estimate used a different date assumption, request a refreshed breakdown before committing the inland order.
- Reconcile the invoice to the confirmed basis. Match the charge to the shipment reference and the agreed pricing date. Separate a dispute about the applicable date from a question about the underlying tariff or the services actually performed; each needs its own supporting record.
Use a shipment-specific transition check
An ocean movement arranged before year-end may have its destination leg ordered later. For that case, ask Maersk to confirm the treatment in writing before relying on an old inland estimate. The advisory does not resolve every possible amendment or cancellation scenario, so teams should confirm how a changed instruction affects the existing import shipment record.
When coordinating destination road transport, make the inland booking reference part of the delivery handoff. In the wider ocean-freight plan, retain the connection between the cargo documents and that inland order so procurement, operations and accounts use the same assumptions.
A changed reference date does not by itself establish that a particular shipment will cost more or less. That comparison requires the applicable quotation and tariff.
03 / Primary source
Carrier announcement and implementation status
This report uses Maersk's dated announcement of its own future pricing policy. Confirm the current instruction and treatment of the particular booking with the carrier before ordering transport.
- Maersk: Change of PCD logic for import shipments — 3 November 2026.