Integrated commodity supply & global logistics

+971 4 250 0715

Carrier news · Ocean freight charges

MSC Extends Asia–Mediterranean and Black Sea Surcharges

MSC has announced wider coverage for two Asia export surcharges. Shippers should check whether their destination was already covered before adding the announced amounts to a freight budget.

Published 5 November 2026 · 3 minute readZenith Eclipse Trade Intelligence

01 / New coverage

Remaining ports join the surcharge scope

MSC's 4 November advisory extends its Piracy Risk Surcharge (PRS) and Suez Canal Surcharge (SCS) from Asia to all Mediterranean and Black Sea ports. The Mediterranean scope includes the western and eastern regions, the Adriatic and North Africa. Application to the remaining ports starts on 15 November 2026, using the proforma date, until further notice.

The announced amounts are USD 55 per TEU for PRS and USD 36 per TEU for SCS. The new development is wider destination coverage, rather than a newly announced increase in those unit amounts.

Check the earlier coverage before treating a charge as new

MSC's 3 September notice applied the same amounts to a named destination list from 15 September. Its 30 September notice added destinations from 19 October. Both earlier notices also used the proforma date. The November announcement extends coverage to the remaining ports; it should not be read as starting every destination's charge on the same day.

02 / Budget arithmetic

Two charge lines, one comparison basis

Adding the two published unit amounts gives USD 91 per TEU. That is our arithmetic from the notice, not an all-in freight quotation. For a booking assessed at two TEU, the same calculation would be USD 182. Confirm the carrier's applicable equipment and charging basis before using that illustration in an order budget.

For a destination already subject to PRS and SCS, adding this combined amount again could overstate the estimate. For a newly covered destination, an earlier quote may need review. The useful comparison is a breakdown showing what was included, on what basis and for which sailing.

03 / Practical implications

Resolve scope and timing before confirming the booking

The following checks are commercial planning implications, not additional conditions announced by MSC:

  • Confirm the exact destination. Ask whether the discharge port was covered by the earlier notices or enters the scope under the November extension. Keep that answer with the quotation instead of relying on a broad regional label.
  • Identify the relevant proforma date. Have the carrier or booking agent confirm which sailing record and date govern the charge. Do not substitute the cargo-ready day, truck gate-in date or actual arrival without confirmation.
  • Reconcile each surcharge line. Request separate PRS and SCS amounts, currency, unit basis and inclusion status. A headline freight price alone does not establish whether these items are already included or will be billed separately.
  • Assign the commercial responsibility. Check who books and pays for freight under the actual sale and transport arrangements. If the quotation changes, obtain acceptance of the revised cost before committing the shipment.

For ocean-freight planning, retain the destination, equipment, sailing reference and surcharge breakdown together. If a sailing or destination changes, ask for a refreshed confirmation so the purchase order and freight estimate remain comparable.

A surcharge announcement does not establish the vessel's actual route, transit time or a shipment-specific security outcome. Confirm those operational details separately with the carrier.

04 / Primary sources

New announcement and earlier scope

The principal source is MSC's 4 November 2026 advisory. The September notices are included only to distinguish earlier coverage from the newly announced extension. Confirm current booking treatment with MSC before committing freight.